Plan for the installation:
- Complete the bench test
- Schedule necessary installation personnel, which can include a welder
- Find and schedule a applicable installation site
Note: A sufficiently approved welder is necessary during installation to attach mounting brackets for system components and clamps for cable routing.
Previous:
Required tools
Next:
Field preparation
myTopcon NOW! support
Take your Topcon experience to the next level with myTopcon NOW! This platform is a self-service tool for your desktop or mobile device.