- Identify the sensor bracket installation locations on the machine before starting physical installation. Be strategic when selecting component locations.
- Select component locations where damage from debris during machine operation can be minimized.
- Keep the space requirements for components and the attachment hardware such as strain relief plates and shield covers in mind.
- Map out the cable routing and hose clamp weld locations.ADDITIONAL INFORMATION:The freedom of movement for various machine parts in relation to cable routing is important.
- Use a permanent marker to identify and outline bracket locations and orientations for the welder.
Previous:
Installation
myTopcon NOW! support
Take your Topcon experience to the next level with myTopcon NOW! This platform is a self-service tool for your desktop or mobile device.