Wiring connections for GNSS masted dozer system

  1. Connect the Bayonet Adapter to the TS-i4 Blade sensor.
  2. Connect the Bayonet Adapter to the coil cable.
  3. Connect the coil cable to the Vibe Pole Tee connector.
  4. Connect the Vibe Pole Tee connector to the M12 Turck cable.
  5. Connect the M12 Turck cable to the GR-i3/GR-i3F receiver.
  6. Connect the terminator to the Vibe Post Tee connector.
  7. Install the TS-i4 Blade sensor cover after measurement and configuration are complete.